Water
Water Main 12" Water main that goes across the front of each lot to provide potable water and fire flow protection
Fire Pump 100 ph fire pump capable of providing 2,300 gpm
Water Pumps Handle tenate's flow for 11 months of the year
1 200 hp well pump
2 10 hp booster pumps
1 75 hp varibale speed pump that handles the flow during processing season.
Reservoir 95,500 gallon with a 300 KW CAT generator for electrial power back up
Hookup Fee $2,500 one time fee for each water meter*
*The buyer is responsible to provide a Port approved backflow assembly and water meter.
Monthly Rate $105.00 per meter with 500 cubic feet (3,750 gallons of water)
Add. Water Rate $0.53 per 100 cubic feet ($0.53 per 748 gallons) for any addtional water over 500 cubic feet.
*Rates are subject to change as needed.

Sewer
Sewer waste is currently taken care of by the business installing a septic tank. The Port has plans to put in a waste treatment plant for the industrial users when it is feasible.

 

Telephone
The local telephone carrier is CenturyLink. Visit www.centruylink.com for more information.

 

Electric
Provider Grant County PUD
Location Ephrata, WA
Ownership Type Municipal
Regulated No
Peak Dema 443 kW
Generation Capacity 1,018 MW
Customers Served 45,998
Phone 509.766.2534
Web Address http://www.gcpud.org/
Average Price a customer pays per kilowatt hour
Residential 4.024 cents
Commercial 3.290 cents
Large Commercial 2.333 cents
Industrial 2.612 cents
For loads not less than 200 kW or more than 5,000 kW billing demand
Basic Charge $110.00
Energy Charge $0.021205 per kWh for the first 50,000 kWh

$0.013255 per kWh for all additional kWh
Demand Charge $4.10 per kW of billing demand
Minimum Charge $110.00 per month
For loads greater than 5,000 kW and less than 15,000 kW billing demand
Basic Charge $200.00 per month
Energy Charge $0.012995 per kWh for the first 7,300,000 kWh
$0.027855 per kWH for all additional kWh
Demand Charge $4.00 per kW of billing demand
Minimum Charge Demand charge times 75% of max billing demand during the most recent 12 month period
Facilities Cost Contribution
For large industrial loads, Grant PUD requires that land be provided by the property owner to the Grant PUD for the use of constructing a substation. There is also a Facilities Cost Contribution as the cost for substation construction and other transmission infrastructure are not built into the Grant PUD rate schedules like you might find at other utilities. The 2011 Facilities Cost Contribution is $126,402 per MW.
10 Average MW per Year for New Customer
A new Grant County PUD customer with a large load is only entitled to 10 average megawatts per year at Grant County PUD rates. This is 87,600,000 kWh per year, or an average of 7,300,000 kWh per month and any use beyond that in a given year will be supplied at market rates. However, a new customer is eligible to recieve an additional 10 average megawatts or 87,600,000 kWh each consecutive year at district rates. This means in year two the customer will recieve 175,200,000 kWh at Grant County PUD rates and in year three they will recieve 262,800,000 kWh at District rates and so on and so on.
 

edclogoandmap

edc-facebooklogo edc-linkedinlogo edc-envelopeicon

Event Calendar

Last month February 2012 Next month
S M T W T F S
week 5 1 2 3 4
week 6 5 6 7 8 9 10 11
week 7 12 13 14 15 16 17 18
week 8 19 20 21 22 23 24 25
week 9 26 27 28 29